Service · 01

Platform Architecture and Modernisation

We assess your current data platforms, then design and implement a fit-for-purpose target architecture for your uses, your volumes and your budget.

Illustrative five-layer platform: sources, collection, data warehouse, models, uses. The storage layer is the one being modernised.

Illustrative

Scope

Six workstreams, one architecture.

  1. Platform in the cloud or on your servers

    Design the target architecture from source to use: storage, processing, security and access.

    Layers touchedSources · Collection · Storage · Models · Uses

  2. Data warehouse modernisation

    Move the existing warehouse forward: how it is organised, its tables and its processing.

    Layers touchedStorage · Models

  3. Platform selection

    Compare the options on your real criteria: volumes, in-house skills, cost and data-residency constraints.

    Layers touchedCollection · Storage · Models

  4. Migration planning

    Sequence the cutovers, run old and new side by side, and plan the rollback.

    Layers touchedSources · Collection · Storage

  5. Legacy modernisation

    Replace scripts, databases on your own servers and fragile processing without interrupting reporting.

    Layers touchedCollection · Storage

  6. Performance and cost optimisation

    Cut query times and the cloud bill: compute, storage and job scheduling.

    Layers touchedStorage · Models · Uses

Migration

Do we have to migrate everything at once?

Rarely. We plan migrations in stages, running the old and new systems in parallel until the numbers match.

Parallel run · gap between the two systemsIllustrative

Illustrative 8-week parallel run: the gap between the old and new systems falls from 3.2% in week 1 to 0% in week 6, when cutover happens, and stays at 0%.

Typical deliverables

Typical deliverables

Each deliverable builds on the one before, from the current-state review to the platform in production.

  1. L1Report · mapCurrent-state assessmentAn inventory of sources, flows, tools and costs, with weak points ranked by risk.
  2. L2Plans · decisionsTarget architectureA plan of the target platform, each technical choice explained, and the security and access rules.
  3. L3Phased planPlatform and migration roadmapCutover steps in order, their dependencies, and the plan for parallel running and rollback.
  4. L4Code · tests · docsModernisation implementationData flows built and migrated, with tests and documentation, delivered in your environment.
  5. L5Before / after measuresPerformance and cost findingsBefore-and-after measures of processing time and cost, with the tuning applied.

When to call us

When to call us

  1. Your warehouse is hitting its limits: slow queries, rising costs, risky changes.

  2. You need to choose a platform and want advice that is independent of vendors.

  3. A migration is coming and you want to plan it rather than suffer it.

Frequently asked questions

Do you work with a particular vendor?
No. Snowflake, Databricks, BigQuery, Microsoft Fabric or PostgreSQL: we recommend the platform that fits your uses and budget, and we have no interest in selling one over another.

The next layer

Start with a current-state assessment

The Data Platform Assessment establishes where things stand in two to three weeks and ends with a costed roadmap.